1. Na Li, Li Zheng, Quanlin Li, Performance Analysis of Two-Loop Closed Production Systems, Computers & Operations Research, 2009, 36(1), 119-134.
2. Na Li, Mike, Li Zheng, Single-Station Performance Evaluation and Improvement in Semiconductor Manufacturing: A Graphical Approach, International Journal of Production Economics, 2007, 107(2), 397-403.
3. Na Li, Shiqing Yao, George Liu, Caihua Zhuang, Optimization of A Multi-Constant Work-In-Process Semiconductor Assembly and Test Factory Base on Performance Evaluation, Computers & Industrial Engineering, 2010, 59(2), 314-322.
4. Na Li, Li Zheng, Zhicong Zhang, Caihua Zhuang, An Overlapping Decomposition Method for Performance Analysis of The Two-Loop Closed Production System in Semiconductor Assembly Factory, International Journal of Computer Integrated Manufacturing, 2011, 24(9), 811-820.
5. Na Li, Zhibin Jiang, George Liu, Analysis of Quality-Caused Re-Entrance Electrical Test System in Semiconductor Manufacturing by Markov Method, International Journal of Production Research, 2012, 50(12), 3486-3497.
6. Na Li, Zhibin Jiang, Modeling and Optimization of a Product-Service System with Additional Service Capacity and Impatient Customers, Computers & Operations Research, 2013, 40(8), 1923-1937.
7. Na Li, Nan Kong, Quanlin Li, Zhibin Jiang, Evaluation of Reverse Referral Partnership in a Tiered Hospital System–A Queuing based Approach, International Journal of Production Research, 2017, 55(19), 5647-5663.
8. Na Li, Xin Yu, Matta Andrea, Modelling and Workload Reallocation of Call Centres with Multi-Type Customers, International Journal of Production Research, 2017, 55(19), 5664-5680.
9. N. Li, D. Teng, and N. Kong (2018). “Threshold Control Policy Optimization for Real-time Reverse Referral Decision of Chinese Comprehensive Hospitals.” IEEE Transactions on Automation Science and Engineering. pp. 1 – 16. doi: 10.1109/TASE.2018.2842772.
10. Shiqing Yao, Zhibin Jiang, Na Li, Na Geng, Xiao Liu, A Decentralised Multi-Objective Scheduling Methodology for Semiconductor Manufacturing, International Journal of Production Research, 2011, 49(24), 7227-7252.
11. Shiqing Yao, Zhibin Jiang, Na Li, A Branch and Bound Algorithm for Minimizing Total Completion Time on a Single Batch Machine with Incompatible Job Families and Dynamic Arrivals, Computers & OR, 2012, 39(5), 939-951.
12. Shiqing Yao, Zhibin Jiang, Na Li, Huai Zhang, Na Geng, A Multi-Objective Dynamic Scheduling Approach Using Multiple Attribute Decision Making in Semiconductor Manufacturing, International Journal of Production Economics, 2011, 130(1), 125-133.
13. Zhicong Zhang, Li Zheng, Na Li, Semiconductor Final Test Scheduling with Sarsa ([Lambda], K) Algorithm, European Journal of Operational Research, 2011, 215(2), 446-458.
14. Zhicong Zhang, Li Zheng, Na Li, Kaishun Hu. Minimizing Mean Weighted Tardiness in Unrelated Parallel Machine Scheduling with Reinforcement Learning, Computers & Operations Research, 2012, 39(7), 1315-1324.
15. Zhicong Zhang, Na Li, Shuai Li, Jiawei Guo, An SMDP Model for a Multiclass Multi-Server Queueing Control Problem Considering Conversion Times, RAIRO - Operations Research, 2014, 48(4), 615-639.
16. Kangzhou Wang, Zhibin Jiang, Na Li, Na Geng, Optimal Production Control of a Service–Oriented Manufacturing System with Customer Balking Behavior, Flexible Services and Manufacturing Journal, 2014, 26(3), 387-407.
17. Kangzhou Wang, Zhibin Jiang, Na Li, Na Geng, Optimal Production and Admission Control for a Stochastic SOM System with Demands for Product and PSS, International Journal of Production Research, 2013, 51(23-24), 7270-7288.